info@central-lubrication.com
+49 (0) 5071 97903 0
+49 (0) 5071 97903 99

VE1B-EA1-00+924-V - Vogel / SKF Minimum quantity lubrication system VectoLub VE1B - 30 mm³

  • Art.-No.: VE1B-EA1-00+924-V(Please choose variation below)
from
651,46 €
excl. 19% VAT , plus shipping costs
Brutto: 775,24 €
incl. 19% VAT , plus shipping costs
  • Delivery time: See item variation **

  • Lubricant: Oil (10 up to 400 mm²/s)
  • Material micropump: Brass
  • Voltage: 24 Volt DC
  • Min. air consumption: 400 Nl/Min.
  • Delivery rate: 3 up to 30 mm³/pulse
  • Inlet air pressure: 5 up to 8 bar
  • Temperature: +10 up to +50°C
  • Connection (Air inlet): G 1/4 cylindrical
  • Connection (Lubricant inlet): G 1/4 cylindrical
  • Adjustment: Dosing rings
  • With Solenoid valve (electrical pulse generator)
Item variations

Item No.
Variant
Delivery time
Price
Quantity
VE1B-EA1-00+924 - Vogel / SKF Minimum quantity...
VE1B-EA1-00+924
  • Delivery time: 2-3 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
651,46 € *
pcs:
VE1B-EA1-10+924 - Vogel / SKF Minimum quantity...
VE1B-EA1-10+924
  • Delivery time: 2-3 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
756,17 € *
pcs:
VE1B-EA2-10+924 - Vogel / SKF Minimum quantity...
VE1B-EA2-10+924
  • Delivery time: 2-3 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
1.035,36 € *
pcs:
VE1B-EA3-00+924 - Vogel / SKF Minimum quantity...
VE1B-EA3-00+924
  • Delivery time: 2-3 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
1.163,31 € *
pcs:
VE1B-EA4-00+924 - Vogel / SKF Minimum quantity...
VE1B-EA4-00+924
  • Delivery time: 2-3 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
1.395,97 € *
pcs:
**Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.