info@central-lubrication.com
+49 (0) 5071 97903 0
+49 (0) 5071 97903 99

WS33-S10-V - Vogel / SKF Fill level switch WS33-S10

  • Art.-No.: WS33-S10-V(Please choose variation below)
401,11 €
excl. 19% VAT , plus shipping costs
Brutto: 477,32 €
incl. 19% VAT , plus shipping costs
  • Delivery time: 3-4 Weeks **

  • SKF Float switch WS33-S10
  • Switching element: Protective gas contact
  • Switching points: 2
  • Contact type: Normally closed / normally open
  • Utility function: Min. level / Max. fill-level
  • Lubricant: Oil (max. 1500 mm²/s)
  • Temperature: -10 to +80°C
  • Length: 300 mm
  • 1. circuit: 50 mm from top
  • 2. circuit: 265 mm from top
  • Electrical connection: Round plug with cable socket and LED
  • Flange: Aluminium
  • Switch tube: CuZn
  • Sealings: NBR
  • Float: PP
  • Mounting position: Vertical
  • Protection class: IP65
Item variations

Item No.
Variant
Delivery time
Price
Quantity
WS33-S10+V16 - Vogel / SKF Fill level switch with two...
WS33-S10+V16
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+V17 - Vogel / SKF Fill level switch with two...
WS33-S10+V17
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+V27 - Vogel / SKF Fill level switch with two...
WS33-S10+V27
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+V69 - Vogel / SKF Fill level switch with two...
WS33-S10+V69
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+V74 - Vogel / SKF Fill level switch with two...
WS33-S10+V74
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+V75 - Vogel / SKF Fill level switch with two...
WS33-S10+V75
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+V85 - Vogel / SKF Fill level switch WS33 -...
WS33-S10+V85
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+W05 - Vogel / SKF Fill level switch with two...
WS33-S10+W05
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+W08 - Vogel / SKF Fill level switch with two...
WS33-S10+W08
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+W18 - Vogel / SKF Fill level switch with two...
WS33-S10+W18
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+W21 - Vogel / SKF Fill level switch with two...
WS33-S10+W21
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+W28 - Vogel / SKF Fill level switch with two...
WS33-S10+W28
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+W29 - Vogel / SKF Fill level switch with two...
WS33-S10+W29
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+W80 - Vogel / SKF Fill level switch with two...
WS33-S10+W80
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+X41 - Vogel / SKF Fill level switch with two...
WS33-S10+X41
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+X46 - Vogel / SKF Fill level switch with two...
WS33-S10+X46
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+X76 - Vogel / SKF Fill level switch with two...
WS33-S10+X76
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+X84 - Vogel / SKF Fill level switch with two...
WS33-S10+X84
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+X86 - Vogel / SKF Fill level switch with two...
WS33-S10+X86
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+X93 - Vogel / SKF Fill level switch with two...
WS33-S10+X93
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+X98 - Vogel / SKF Fill level switch with two...
WS33-S10+X98
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+Y72 - Vogel / SKF Fill level switch with two...
WS33-S10+Y72
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+Y77 - Vogel / SKF Fill level switch with two...
WS33-S10+Y77
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+Y85 - Vogel / SKF Fill level switch with two...
WS33-S10+Y85
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+Y87 - Vogel / SKF Fill level switch with two...
WS33-S10+Y87
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+Y91 - Vogel / SKF Fill level switch with two...
WS33-S10+Y91
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+ZG9 - Vogel / SKF Fill level switch with two...
WS33-S10+ZG9
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
WS33-S10+ZL8 - Vogel / SKF Fill level switch with two...
WS33-S10+ZL8
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
401,11 € *
pcs:
**Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.