info@central-lubrication.com
+49 (0) 5071 97903 0
+49 (0) 5071 97903 99

2103024021200-V - BEKA MAX - Piston Pump - Grease - progressive lubrication systems - 1,0 / 4,0 kg Sheet steel Reservoir - 3/2-way solenoid valve - 4-8 bar

  • Art.-No.: 2103024021200-V(Please choose variation below)
Price on request
  • Delivery time: See item variation **

  • Delivery rate: 2 cm³/stroke
  • Pressure transmission ratio: 1:32
  • Max. operating pressure: 250 bar
  • Reservoir capacity: 1 kg / 1,5 kg / 2 kg / 3 kg / 4 kg
  • Reservoir material: Sheet steel
  • Lubricant: Grease up to NLGI-Cl. 2
  • Operating temperature: 0 up to +70 °C
  • Number of outlets: 1
  • Type of outlet: Thread connection G 1/4
  • Mounting position: vertical
  • Drive: pneumatic
  • Drive type: 3/2-way solenoid valve single pressurized
  • Drive pressure: 4 - 8 bar
  • Without Fill level monitoring
  • Without optical filling indicator
  • Suitable for progressiv lubrication systems
Item variations

Item No.
Variant
Delivery time
Price
Quantity
2103024021200 - BEKA MAX - Piston Pump - Grease -...
2103024021200
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
Price on request
2103024031200 - BEKA MAX - Piston Pump - Grease -...
2103024031200
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
Price on request
2103024041200 - BEKA MAX - Piston Pump - Grease -...
2103024041200
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
Price on request
2103024051200 - BEKA MAX - Piston Pump - Grease -...
2103024051200
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
Price on request
2103024061200 - BEKA MAX - Piston Pump - Grease -...
2103024061200
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
Price on request
**Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.