info@central-lubrication.com
+49 (0) 5071 97903 0
+49 (0) 5071 97903 99

21971103000-V - BEKA MAX - Lubrication system - Drum Pump EFP-1 - Gear motor - 230/400 V - various drum sizes

  • Art.-No.: 21971103000-V(Please choose variation below)
Price on request
  • Delivery time: See item variation **

  • Delivery rate: 0,33 cm³/stroke bzw. rotation
  • Depending on the operating temperature
  • Power: 230/400 V AC, 0,18 kw, 50/60Hz
  • Protection class: IP 55
  • Speed: 40 rpm
  • ISO class: F
  • Drive: Three phase gearmotor
  • Various drum sizes
  • Operating pressure: max. 300 bar
  • Pressure limiting valve set to: 280 bar
  • Lubricant: Grease up to NLGI-Kl. 2 without fixed material parts
  • Operating temperature: Grease up to NLGI-Kl. 2: -17 up to 70 °C
  • Operating temperature: Grease up to NLGI-Kl. 1: -25 up to 70 °C
  • Number of outlets: 1
  • Type of outlet: Fitting with integr. non-return valve
  • Incl. pressure limiting valve and high pressure plug-in coupling
  • Direction of rotation: any
  • Mounting position: Reservoir, vertical
Item variations

Item No.
Variant
Delivery time
Price
Quantity
21971103000 - BEKA MAX - Lubrication system - Drum Pump...
21971103000
  • Delivery time: 4-5 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
Price on request
21971104000 - BEKA MAX - Lubrication system - Drum Pump...
21971104000
  • Delivery time: 4-5 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
Price on request
21971105000 - BEKA MAX - Lubrication system - Drum Pump...
21971105000
  • Delivery time: 4-5 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
Price on request
21971106000 - BEKA MAX - Lubrication system - Drum Pump...
21971106000
  • Delivery time: 4-5 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
Price on request
**Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.