info@central-lubrication.com
+49 (0) 5071 97903 0
+49 (0) 5071 97903 99

MKF2-12B-V - Vogel / SKF single line pump - Fluid grease - 3 Liter - 0,2 l/min - Plastic resevoir - Without control

  • Art.-No.: MKF2-12B-V(Please choose variation below)
from
808,43 €
excl. 19% VAT , plus shipping costs
Brutto: 962,03 €
incl. 19% VAT , plus shipping costs
  • Delivery time: See item variation **

  • SKF single line pump MKF2
  • Different designs
  • Suitable for fluid grease
  • Reservoir capacity: 3 Liter
  • Reservoir material: Plastic
  • Delivery rate: 0,2 l/min
  • Max. operative pressure: 30 bar
  • Temperature range: +10 to +40°C
  • Protection class IP 54
  • Thread: G 1/4
Item variations

Item No.
Variant
Delivery time
Price
Quantity
SKF single line pump MKF2-12BB12000 - Fluid grease - 24...
MKF2-12BB12000+924
  • Delivery time: 4-6 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
1.175,79 € *
pcs:
SKF single line pump MKF2-12BB12000 - Fluid grease - 230...
MKF2-12BB12000+428
  • Delivery time: 4-6 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
981,90 € *
pcs:
SKF single line pump MKF2-12BC02000 - Fluid grease - 24...
MKF2-12BC02000+924
  • Delivery time: 4-6 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
1.153,75 € *
pcs:
Vogel / SKF single line pump MKF2-12BA00000 - Fluid...
MKF2-12BA00000+428
  • Delivery time: 4-6 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
808,43 € *
pcs:
Vogel / SKF single line pump MKF2-12BA10000 - Fluid...
MKF2-12BA10000+924
  • Delivery time: 4-6 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
1.111,71 € *
pcs:
Vogel / SKF single line pump MKF2-12BA11000 - Fluid...
MKF2-12BA11000+429
  • Delivery time: 4-6 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
941,74 € *
pcs:
Vogel / SKF single line pump MKF2-12BA11000 - Fluid...
MKF2-12BA11000+428
  • Delivery time: 4-6 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
941,74 € *
pcs:
Vogel / SKF single line pump MKF2-12BB01000 - Fluid...
MKF2-12BB01000+924
  • Delivery time: 4-6 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
1.056,16 € *
pcs:
Vogel / SKF single line pump MKF2-12BB01000 - Fluid...
MKF2-12BB01000+428
  • Delivery time: 4-6 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
862,28 € *
pcs:
Vogel / SKF single line pump MKF2-12BB10000 - Fluid...
MKF2-12BB10000+924
  • Delivery time: 4-6 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
1.141,64 € *
pcs:
Vogel / SKF single line pump MKF2-12BB11000 - Fluid...
MKF2-12BB11000+924
  • Delivery time: 4-6 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
1.165,58 € *
pcs:
Vogel / SKF single line pump MKF2-12BB11000 - Fluid...
MKF2-12BB11000+428
  • Delivery time: 4-6 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
971,67 € *
pcs:
Vogel / SKF single line pump MKF2-12BC01000 - Fluid...
MKF2-12BC01000+428
  • Delivery time: 4-6 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
949,62 € *
pcs:
Vogel / SKF single line pump MKF2-12BC10000 - Fluid...
MKF2-12BC10000+924
  • Delivery time: 4-6 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
1.229,00 € *
pcs:
Vogel / SKF single line pump MKF2-12BC10000 - Fluid...
MKF2-12BC10000+428
  • Delivery time: 4-6 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
1.035,12 € *
pcs:
Vogel / SKF single line pump MKF2-12BC11000 - Fluid...
MKF2-12BC11000+924
  • Delivery time: 4-6 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
1.252,94 € *
pcs:
Vogel / SKF single line pump MKF2-12BC11000 - Fluid...
MKF2-12BC11000+429
  • Delivery time: 4-6 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
1.059,03 € *
pcs:
Vogel / SKF single line pump MKF2-12BC12000 - Fluid...
MKF2-12BC12000+924
  • Delivery time: 4-6 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
1.263,16 € *
pcs:
**Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.