info@central-lubrication.com
+49 (0) 5071 97903 0
+49 (0) 5071 97903 99

203404104C3000-V - BEKA MAX - Grease lubrication Pump - with 230/400 V Motor - 5,0 / 10,0 kg Sheet steel Reservoir - PE 120 - Fill level monitoring - 450:1

  • Art.-No.: 203404104C3000-V(Please choose variation below)
Price on request
  • Delivery time: See item variation **

  • Drive: Three-phase worm gear motor
  • Power output: 0,12 kW
  • Operating voltage: 230/400 VAC/ 3~, 50 Hz
  • Rotational speed: 2800 U/min at 50 Hz
  • 3300 U/min at 60 Hz
  • ISO-Cl.: F
  • Protection class: IP 55
  • Reservoir capacity: 5 kg / 7,5 kg / 10 kg
  • Reservoir material: Sheet steel
  • Reservoir without Filler cap
  • With fill level monitoring (min) M12x1 Standard
  • Transmission ratio: 18:1
  • Delivery rate per stroke/Outlet (= 1 Pump rotation): 0,06 up to 0,17 cm³ (depending on pump element)
  • Regulation: possible at PE 120 V
  • Operating pressure: max. 250 bar
  • Lubricant: Grease up to NLGI-Cl. 2
  • Operating temperature: -20 up to 70 °C
  • Number of outlets: 4 max. 20 possible
  • Pump element: 1x PE 120
  • Drive: rotating
  • Drive torque: 0,8 Nm at 20 outlets
  • Mounting position: Reservoir vertical
  • Filling connection: M20x1,5
Item variations

Item No.
Variant
Delivery time
Price
Quantity
203404104C3000 - BEKA MAX - Grease lubrication Pump -...
203404104C3000
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
Price on request
203404104C5000 - BEKA MAX - Grease lubrication Pump -...
203404104C5000
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
Price on request
203404104C6000 - BEKA MAX - Grease lubrication Pump -...
203404104C6000
  • Delivery time: 3-4 Weeks **

  • **Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.
Price on request
**Due to the general shortage of materials and the difficult global delivery situation, the delivery time may vary.